On the 2nd attempt ICE Electrical Solutions successfully won this
project again with Cleland’s Construction.
The project presented a milestone for ICE Electrical as the projects scope of
work also included the structured cabling for the data and phone systems. This
work normally subcontracted out was completed in house with the addition of a
new staff member highly skilled in the data trade. The challenge was accepted
and professionally completed to the client’s satisfaction.
Another challenge was the management of the security sub trade. Typically this
would be managed by the main contractor but not on this occasion. The security
system was sub contracted out to Cactus Security who successfully completed the
project with the desired result.
With the above challenges managed successfully the electrical portion was as
typical of any other project non the less with its usual challenges staring with
the Powerco Network connection and upgrade to adaptation of specialist lighting
ensuring that it would fit in with
onsite changes to the ceiling structure and design. The project ran from
November 2006 – June 2007 totalling almost 1000 man hours of work.
|